Determination in Sub-Clause 3.7 of FIDIC 2017 YB and RB (and 3.5 of SB)
Sub-Clause 3.7 of the FIDIC Red and Yellow Books covers the vital role of the Engineer to determine an open issue (disputed claim). This, in case the Parties are not able to agree. The Silver Book has the same clause. But, as the latter doesn’t have the role of “Engineer”, Read more…